SPP’s MOPC asked staff to re-evaluate whether two transmission projects should have their need dates accelerated.
The post Wind Growth Causes SPP to Take 2nd Look at Tx Projects appeared first on RTO Insider.
SPP’s MOPC asked staff to re-evaluate whether two transmission projects should have their need dates accelerated.
The post Wind Growth Causes SPP to Take 2nd Look at Tx Projects appeared first on RTO Insider.